Trade, contract and fit-out

Ninety covers,one delivery date

Contract furniture fails on scheduling, not on taste. Because every stage happens in our building, we can commit to a date at quotation and hold it.

Minimum

10 pieces

Typical

8–14 weeks

Trade terms

On account

What we take on

Three kinds of project.

All three run through the same floor and the same four stages. What changes is the scheduling, the documentation and how much of it we install.

Recent work

Empty room, then ours.

Drag the handle across each room. These are drawings of real commissions while the photography is being shot — the dimensions, timelines and piece counts are the actual ones.

Before After

Private residence

A majlis in Al Nakheel

Eleven pieces for a family majlis — seating along three walls, two low tables and a bench, all cut from a single run of bone bouclé so nothing is a near-match.

Pieces
11
Fabric
One dye lot
Delivered
6 weeks
Changed mid-build
Fabric, once
Before After

Hospitality

Hotel lobby, ninety covers

Our largest contract to date. Lounge seating, side tables and a reception desk, phased across three deliveries so the ground floor could open on schedule.

Pieces
90
Specification
Contract grade
Delivered
14 weeks
Phases
3
Before After

Workplace

A boardroom on King Fahd Road

One four-metre walnut table, book-matched across the centre, with twelve chairs and power routed through the pedestal rather than drilled through the top.

Pieces
13
Table
4.0 m, one slab
Delivered
9 weeks
Power
Routed in pedestal
How trade works

Drawings, then a date.

Send us a schedule or a mood board and you get a quotation with a production date on it, not a lead-time range. We hold ten per cent of capacity each month for contract work so a project never queues behind the retail floor.

Quotation
3 working days
Sample piece
10–14 days
Payment
40 / 40 / 20 on account
Installation
Our own crew, Kingdom-wide

34

Contract projects delivered since 2023

90covers

Largest single hospitality order

14weeks

Delivered, from drawings to install

10%

Monthly capacity reserved for trade

Ninety covers, fourteen weeks, and they hit the date. In this city that sentence is worth more than the discount.
Khalid Al-DossariProject director, hospitality group

Come and sit in it first.

The showroom on Al Kharj Road holds every piece in this catalogue. Book a slot and we will have the fabrics and finishes waiting on the table.